Skip to Content

STEP 04 · DEPLOY

From plan to active remediation.

Get Started 

Deployment Sequencing


Deployment follows a sequence for the most efficient possible transformations and results. The categories you choose will be placed in a sequence based on the following order:

The fixed systems, the iron that runs them, and any specialized work the build depends on. Water handling, containment, drainage, pads, and structures go in before anything goes into the ground. On this sector that is most of the build.

With the systems in place, the ground gets what it needs: corrections, living soil, and the control that keeps pressure off disturbed and reclaimed ground. These three lead the work that goes into the soil itself.

Planting and the animal work come in at the same time or close behind Chemistry, Biology, and Protection. Reclamation cover goes into ground that is ready to carry it, and any species accommodation or exclusion is built where the site calls for it. Those three still lead; planting and animal work follow.

With the build in and running, the site gets its maintenance and closure structure and your crews get trained to carry it. This comes last because you cannot run or teach a system that is not yet in place.

What Comes After

From action to proof.

Start Defining Discover how Edapho Demonstrates