
Deployment Sequencing
Deployment follows a sequence for the most efficient possible transformations and results. The categories you choose will be placed in a sequence based on the following order:
The fixed systems, the iron that runs them, and any specialized work the build depends on. Water, access, sampling infrastructure, and fencing go in before anything goes into the ground.
With the systems in place, the ground gets what it needs: corrections, living soil, and the control that keeps pressure off. These three lead the work that goes into the soil itself.
Planting and the grazing program come in at the same time or close behind Chemistry, Biology, and Protection. Cover goes into ground that is ready to carry it, and where grazing is part of the project, the stock go onto the program the design worked out. Those three still lead; planting and animal work follow.
With the build in and running, the project gets structured around it and your team gets trained to carry it. This comes last because you cannot run or teach a system that is not yet in place.
What Comes After