
Deployment Sequencing
Deployment follows a sequence for the most efficient possible transformations and results. The categories you choose will be placed in a sequence based on the following order:
The fixed systems, the iron that runs them, and any specialized work the build depends on. You put in what holds water, moves material, and carries the operation before you put anything into the ground.
With the systems in place, the ground gets what it needs: corrections, living soil, and the control that keeps pressure off. These three lead the work that goes into the soil itself.
Planting and the animal program come in at the same time or close behind Chemistry, Biology, and Protection. Seed goes into ground that is ready to carry it, and the stock already on your place go onto the feed, mineral, and supplement program built for them. Those three still lead; seed and stock follow.
With the build in and running, the operation gets structured around it and your people get trained to carry it. This comes last because you cannot run or teach a system that is not yet in place.
What Comes After