
Deployment Sequencing
Deployment follows a sequence for the most efficient possible transformations and results. The categories you choose will be placed in a sequence based on the following order:
The fixed systems, the iron that runs them, and any specialized work the build depends on. Drainage, stormwater, foundations, subgrade, roads, and structures go in before anything goes into the ground. On this sector that is most of the build.
With the systems in place, the ground gets what it needs: corrections, living soil, and the control that keeps pressure off. These three lead the work that goes into the soil itself.
With the systems in place, the ground gets what it needs: corrections, living soil, and the control that keeps pressure off disturbed ground. These three lead the work that goes into the soil itself.
Planting and the animal work come in at the same time or close behind Chemistry, Biology, and Protection. Revegetation and landscape plantings go into ground that is ready to carry them, and any species accommodation or exclusion is built where the site calls for it. Those three still lead; planting and animal work follow.