Skip to Content

STEP 04 · DEPLOY

From plan to action.

Get Started 

Deployment Sequencing


Deployment follows a sequence for the most efficient possible transformations and results. The categories you choose will be placed in a sequence based on the following order:

The fixed systems, the gear that runs them, and any specialized work the build depends on. Water filtration, pools, drainage, ventilation, and hardscape go in before anything goes into the ground. On this sector that is often most of the build.

With the systems in place, the grounds and the water get what they need: correction, living biology, and the control that keeps pressure off. These three lead the work that goes into the soil and the water.

Planting and the animal work come in at the same time or close behind Chemistry, Biology, and Protection. The landscape goes into ground that is ready to carry it, and your place gets set up for the animals on it. Those three still lead; planting and animal work follow.

With the build in and running, your place gets a management system and you and your staff get trained to carry it. This comes last because you cannot run or teach a system that is not yet in place.

What Comes After

From action to proof.

Start Defining Discover how Edapho Demonstrates